2011 Limited Scope Biodiversity Assessment (BIA) for Kranji Reservoir Crossing Project

The Kranji Crossing of the New Natural Gas Transmission Pipeline from Tuas Power Station to Senoko Metering Station was a project by PowerGas Ltd in a bid to connect the SLNG terminal to the existing gas network for the conveyance of re-gasified LNG to Power Stations by laying gas transmission pipelines from Tuas Power Station to Senoko Metering Station.

The Limited Scope Biodiversity Impact Assessment (BIA) was carried out to ensure that the project does not cause any substantial pollution of or significant and harmful changes to the terrestrial and marine environment of Singapore.

Enviro Pro was tasked with conducting a Biodiversity Baseline Assessment covering two of the proposed work sites, determining some to the potential impacts on biodiversity, conducting environmental monitoring from the pre-construction phase to the post-construction phase and providing mitigation methods to prevent significant impacts to the environment during the entire course of the project.

Key Study Methods

Biodiversity Assessment – Transect techniques were used during the principle detailed field surveys which was carried out for a month.

SINGLAS accredited laboratory testing for Water Quality – Baseline condition obtained were compared with established guidelines to predict future impacts.