Enviro Pro developed and applied environmental evaluation criteria for proposed irrigation schemes, prepared Initial Environmental Examination Reports according to Asian Development Bank's (ADB) environmental safeguard policies for sub-projects. This project also involved providing the framework process for environmental and spatial assessment along the west coast of Aceh Province. Finally, Enviro Pro also assisted with the GIS development for project's environmental screening database, showing environmentally sensitive areas.
Enviro Pro developed and applied environmental evaluation criteria for proposed irrigation schemes, prepared Initial Environmental Examination Reports according to Asian Development Bank's (ADB) environmental safeguard policies for sub-projects. This project also involved providing the framework process for environmental and spatial assessment along the west coast of Aceh Province. Finally, Enviro Pro also assisted with the GIS development for project's environmental screening database, showing environmentally sensitive areas.
Enviro Pro prepared an initial environmental examination (IEE) or environmental impact assessment (EIA) and a summary IEE or summary EIA for the whole project, in accordance with applicable national standards and in line with ADB requirements. Also, Enviro Pro synchronized environmental assessment requirements between GoI and ADB.
2011 Limited Scope Biodiversity Assessment (BIA) for Kranji Reservoir Crossing Project
The Kranji Crossing of the New Natural Gas Transmission Pipeline from Tuas Power Station to Senoko Metering Station was a project by PowerGas Ltd in a bid to connect the SLNG terminal to the existing gas network for the conveyance of re-gasified LNG to Power Stations by laying gas transmission pipelines from Tuas Power Station to Senoko Metering Station.
The Limited Scope Biodiversity Impact Assessment (BIA) was carried out to ensure that the project does not cause any substantial pollution of or significant and harmful changes to the terrestrial and marine environment of Singapore.
Enviro Pro was tasked with conducting a Biodiversity Baseline Assessment covering two of the proposed work sites, determining some to the potential impacts on biodiversity, conducting environmental monitoring from the pre-construction phase to the post-construction phase and providing mitigation methods to prevent significant impacts to the environment during the entire course of the project.
Key Study Methods
Biodiversity Assessment – Transect techniques were used during the principle detailed field surveys which was carried out for a month.
SINGLAS accredited laboratory testing for Water Quality – Baseline condition obtained were compared with established guidelines to predict future impacts.