top of page

2016 Intertidal and Coral Reef Habitat Survey of EMMP for Construction of Changi Collector Drain 2

SSKB JV and Changi Airport Group proposed to develop a new drainage outfall structure at the Northern and Southern end of Changi Coast, close to the existing Changi Collector Drain 2.

 

An Environmental Management and Monitoring Programme (EMMP) was conducted and compiled in response to the development proposal. Enviro Pro has been commissioned to conduct the ecological survey of the Intertidal and Coral Reef Habitats at and surrounding the proposed outfall location near theTanah Merah Beach.

 

The survey encompasses:

  • Seagrass

  • Invertebrates

  • Coral

  • Fish

bottom of page