2012 Environmental Improvement Study for International Engine Component Overhaul (IECO) Pte Ltd

Enviro Pro was tasked by IECO to conduct an Environmental Improvement Study at their factory premises. The purpose of this study was to determine potential environmental risks or non-compliances with respect to the efficacy wastewater treatment, shop floor noise levels, and potential spillages or leakages from pipelines within the shop floor. Enviro Pro also provided recommendations to avoid non-compliances and mitigate risks to acceptable levels.

​The scope of this study can be divided into the following:

​- Pipeline Mapping and Risk Assessment,

​- Noise Monitoring and Assessment, and

​- Water Quality Analysis and Technical Assessment of the Waste Water Treatment Plant.