top of page

2014 Consultancy Services for Proposed 6th Waste-to-Energy Plant in Tuas

Enviro Pro performed an analysis of primary environmental data and Waste-to-Energy (WTE) plant emission data to develop and produce reports prior to the construction of the 6th WTE plant in Singapore.

​Scope of work performed includes:

- ​Environmental Impact Assessment,

- Environmental Baseline Study,

- Pollution Control Study,

- Quantitative Risk Assessment, and

- Soil Investigation.

bottom of page