top of page

Consultancy Services for Proposed 6th Waste-to-Energy Plant in Tuas

Enviro Pro performed an analysis of primary environmental data and Waste-to-Energy (WTE) plant emission data to develop and produce reports prior to the construction of the 6th WTE plant in Singapore. 

​

Scope of work performed includes:

​

  • Environmental Impact Assessment,

  • Environmental Baseline Study,

  • Pollution Control Study,

  • Quantitative Risk Assessment, and

  • Soil Investigation.

IMG_4243
Enviromental Control Measures Photo 2
sea side
IMG_4242
bottom of page